Active Topics Memberlist Calendar Search Help | |
Register Login |
One Stop GATE Forum : GATE AT A GLANCE : Basic GATE Info |
Topic: Computer Organization | |
Author | Message |
aparna
Groupie Joined: 30Apr2007 Online Status: Offline Posts: 70 |
Topic: Computer Organization Posted: 26Nov2007 at 2:33am |
Computer
Organization
In a certain machine data references constitute 40% of the mix, and that the ideal CPI of the pipelined machine is 1. Assume that the machine with structural hazards has a clock rate that is 1.05 times higher than the clock rate of machine without hazard. What is effective speedup with pipelining without structural hazard? Options 1. 1.05 2. 1.3 3. 1 4. none of above Ans: 2 Explanation: We major the average instruction time on both the machines to access speedup/slowdown. Avg. instruction time = CPI * clock cycle time Since there are no stalls/hazards, the average instruction time for ideal machine is the clock cycle times. The average clock cycle time for the machine with 40% structural hazard is M = (1+0.4 x 1) x Clock cycle time ideal/1.05 = 1.3 clock cycle time ideal Machine without structural hazard is 1.3 times faster. Post Resume: Click here to Upload your Resume & Apply for Jobs |
|
IP Logged | |
Forum Jump |
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |
|
© Vyom Technosoft Pvt. Ltd. All Rights Reserved.