![]() |
![]() ![]() ![]() ![]() ![]() |
![]() ![]() |
![]() |
![]() |
![]() ![]() |
Author | Message |
Neha Agarwal
Groupie ![]() Joined: 04Jan2007 Online Status: Offline Posts: 59 |
![]() ![]() ![]() Posted: 04Jan2007 at 5:11pm |
1)A soldering operation was work-sampled over two days (16 hours) during which an employee soldered 108 joints. Actual working time was 90% of the total time and the performance rating was estimated to be 120 percent. If the contract provides allowance of 20 percent of the total time available, the standard time for the operation would be A) 8 min B) 8.9 min C) 10 min D) 12 min Answer : (D) 2) A welding operation is time-studied during which an operator was pace-rated as 120%. The operator took, on an average, 8 minutes for producing the weld-joint. If a total of 10% allowances are allowed for this operation, the expected standard production rate of the weld-joint (in units per 8 hour day) is A) 45 B) 50 C) 55 D) 60 Answer : (A) 3) In PERT analysis a critical activity has A) maximum Float B) zero Float C) maximum Cost D) minimum Cost Answer : (B) 4) Environment friendly refrigerant R134a is used in the new generation domestic refrigerators. Its chemical formula is A) CH C1 F2 B) C2 C13 F3 C) C2 C12 F4 D) C2 H2 F4 Answer : (D) |
|
For more papers visit:
http://onestopgate.com/gate-preparation// Post Resume: Click here to Upload your Resume & Apply for Jobs |
|
![]() |
|
![]() ![]() |
||
Forum Jump |
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |
|
© Vyom Technosoft Pvt. Ltd. All Rights Reserved.